The 2019 letter from Railbelt Utilities to the Regulatory Commission of Alaska on the confidential Critical Infrastructure Protection (CIP) standards.
Document Search
-
-
Alaska Railbelt 2017 Consensus Standard: Generator Operation for Maintaining Network Voltage Schedules.
-
Alaska Railbelt 2017 Consensus Standard: Voltage and Reactive Control.
-
Alaska Railbelt 2017 Consensus Standard: Transmission Planning Performance Requirements.
-
Alaska Railbelt 2017 Consensus Standard: Reserve Obligation and Allocation.
-
Alaska Railbelt 2017 Consensus Standard: Automatic Underfrequency Load Shedding.
-
Alaska Railbelt 2017 Consensus Standard: Steady-State and Dynamic System Model Validation.
-
Alaska Railbelt 2017 Consensus Standard: Data for Power System Modeling and Analysis.
-
Alaska Railbelt 2017 Consensus Standard: Total Transfer Capability.
-
Alaska Railbelt 2017 Consensus Standard: Verification of Models and Data for Turbine/Governor and Load Control or Active Power/Frequency Control Functions.
-
Alaska Railbelt 2017 Consensus Standard: Verification of Models and Data for Generator Excitation Control System or Plant Volt/Var Control Functions.
-
Alaska Railbelt 2017 Consensus Standard: Verification and Data Reporting of Generator Real and Reactive Power Capability and Synchronous Condenser Reactive Power Capability.