Transmission System Performance Requirements
- ID Number: RRC-TPL-001
- Classification Category: (TPL) Transmission Planning
- Status: In Progress
This standard establishes Transmission system planning performance requirements within the planning horizon to develop a System that will operate reliably over a broad spectrum of conditions and following a wide range of probable Contingencies applicable to the portions of the Bulk Electrical System (BES) used to supply power to or from major load and generation centers.