Transmission System Performance Requirements
- ID Number: RRC-TPL-001
- Classification Category: (TPL) Transmission Planning
- Status: In Progress
This standard establishes Transmission system planning performance requirements within the planning horizon to develop a System that will operate reliably over a broad spectrum of conditions and following a wide range of probable Contingencies applicable to the portions of the Bulk Electrical System (BES) used to supply power to or from major load and generation centers.
13 days until brought before the Board for approval.