Skip to content

Document Search

  1. On December 31, 2024, the RRC filed four proposed reliability standards with the Regulatory Commission of Alaska (RCA) under Matter No. TE8-9001: Frequency and Response Bias (RRC-BAL-003-1), Evaluation of Interchange Transactions (RRC-INT-006-1), Voltage and Reactive Control (RRC-VAR-001-1), and Generator Operations for Maintaining Network Voltage Schedules (RRC-VAR-002-1).

    • Regulatory